Event Logo Image

📅 Project Timeline

We’re building momentum toward a new playground—and here’s how the journey unfolds:

  • November 16, 2025 – February 1, 2026 Building Our Backyard fundraising campaign runs through winter. Every gift helps us reach our goal.

  • May 25, 2026 Our Annual Auction Fund-a-Need will support any remaining funding needed to complete the project.

  • Summer 2026 Playground build and installation begins—potentially with volunteer support through a Community Build.

  • August 2026 Our new playground opens for students on the first day of school!

 

🛠️ Vendor Bids & Selection

We received bids from multiple playground vendors and carefully reviewed each proposal based on cost, design quality, inclusivity, and long-term durability. 

Vendor Estimated Cost Highlights Notes
Miracle PlaySystems $223,000 Modular design Higher Cost, North Seattle location
NW Playground $212,000 Custom design, option for ForeverLawn Turf (at additional cost) Site prep not included, furthest location from school (Issaquah)
PlayCreation $192,000 Custom design, inclusive features, Community Build option Great value and location adjacent to school

PlayCreation’s design reflects our vision for an inclusive, welcoming space—and offers a Community Build option to help reduce installation costs through volunteer support.

🎨 Initial Design Specs

PlayCreation’s first drafts include:

  • A large central climbing structure

  • Multiple slides and swings

  • Sensory panels and inclusive features

  • Engineered wood fiber surfacing

  • Accessible pathways and entry points

This draft design illustrates what our $200,000 fundraising goal makes possible: a safe, inclusive, and engaging playground that meets the needs of all our students and reflects the values of our school and parish community. As we move forward, we’ll be seeking donor and community feedback to refine design elements and ensure the final playground reflects our shared vision and priorities.

Playground Option A
Playground Option B
Kids on slide